Listed below are the various stages of the restoration,
click on the numbered links to see images relating to each stage,
Body stripped off chassis (10/04/02) 1 2 3 4 5 6 7
Bulkhead stripped and removed, (18/05/02) 1 2 3
Engine and Gearbox removal (21/05/02) 1 2 3 4 5 6 7 8 9 10
Chassis stripped and cut up for disposal (17/06/02) 1 2 3 4
Front and rear axle stripped ready for refurbishment (20/06/02)
Parts acquired for bulkhead repair. (15/07/02)
Running gear cleaned and painted (17/10/02) 1 2 3
Bulkhead grit blasted and undergoing repair (24/10/02) 1 2 3 4 5
Replacement rear axle purchased cleaned and painted. (10/10/02)
Front and Rear axle re-assembled (01/12/02) 1 2 3 4 5
New chassis delivered (22/12/02) 1 2 3
Axles fitted to chassis (09/01/03) 1 2 3
Gearbox refurbishment & fitting into chassis 1 2 3 4 5 6 7 8 9
Bulkhead repairs completed - preparation ready for painting (26/06/03) 1 2 3
Engine stripped, rebored and painted ready for reassembly (26/06/03) 1 2 3 4 5 6 7
Half engine completed and ready to fit in chassis (20/07/03) 1 2 3
Half engine fitted into chassis (11/09/03) 1 2 3
Bulkhead preparing and painting 1 2 3 4 5 6
Front light /radiator panel repairs 1 2 3 4 5 6 7 8
Seatbox stripping and refurbishment (01/12/03) 1 2 3 4 5 6 7 8 9
Bulkhead component re-fitting (29/08/04) 1 2 3 4 5 6 7 8
Dash panel assembly and installation (10/10/04) 1 2 3 4 5
Rear Tub and Seatbox to Chassis fitting trial (03/01/05) 1 2 3 4 5
Seatbox Prepared (14/01/05) 1 2 3 4 5
Wings Bonnet and Tailgate Prepared (24/04/05) 1 2 3 4 5
Light Panel Fitted (20/05/05) 1 2 3
Rear Tub Repair (15/08/05) 1 2 3 4
Rear Tub trial (28/09/05) 1 2 3 4 5
Screen and Tub Fitted (15/12/05) 1 2 3 4 5
Re-fitting Bodywork (07/01/06) 1 2 3 4 5 6 7 8 9
Door tops and hoodsticks fitted (04/05/06) 1 2 3 4 5 6 7 8
Full Tilt fitted (06/06/06) 1 2 3 4 5 6 7 8 9
Nearly finished !!!!
To go to Home page (click here)